Product Introduction
The multi-arc ion coating machine is a process test instrument used in the field of materials science, with multiple functions and applications. It is mainly used for coating various hard metal films, metal compound films and decorative films on the surface of metals, ceramics, glass and other materials. The characteristics of this equipment include fast pumping speed, stable vacuum, large loading capacity, and good coating uniformity. The technical indicators and design features of the multi-arc ion coating machine reflect its high performance and wide application in the field of materials science.
Product Advantage
The advantages of multi-arc ion plating machines mainly include high efficiency, no pollution, fast deposition speed, high ionization rate, large ion energy, simple equipment operation, low cost and large production volume.
Wide range of applications: The multi-arc ion coating machine can coat not only metal products, but also non-metal products (such as glass, ceramics, etc.). It can coat metal films, titanium nitride, titanium carbide and other compound films and multi-layer super-hard films. It is widely used in super-hard coatings of tools and molds, as well as automobile wheels, sanitary ware and other fields.
High deposition rate: For some materials such as TiN, the multi-arc ion coater can achieve a deposition rate of up to 100nm/s~1000nm/s
Simplified process flow: The process flow of the multi-arc ion plating machine is simple, and the entire processing process can be completed in a very short time, which improves production efficiency.
Technical Parameters
Model | LY1215 LY1315 LY1615 |
Chamber size | 1200*1500mm, 1300*1500mm, 1600*1500mm |
Sputter able materials | ZrN, TiN, TiN, CrN, TiCN, TiAIN, TiAICN, TiAlCrN etc. |
Coating color | Gold, champagne gold, gun black, dark black, rose gold, blue, green, etc. |
Application fields | sanitaryware, watches, stainless steel furnture, hardware indust res. |
Vacuum structure | Mechanical pump, turbo/Diffusion pump, Roots Pump, holding pump |
U imate vacuum(Pa) | 8.0x10-4Pa |
Heater power | 27KW |
Number of multi-arc targets | 8/10sets, 10/12sets, 14/16sets |
Product Uses
Multi-arc ion plating machines are widely used in the fields of super-hard coatings for tools and molds, decorative coatings for golf clubs, clocks, sanitary ware, lamps, eyeglass frames, hardware products, ceramics and glass, etc.
This equipment adopts the technology of cathode arc evaporation ion plating, based on cold cathode self-sustaining arc discharge plasma evaporation and ionization plating materials, combined with pulse bias technology to improve the energy and activity of deposited particles, thereby enhancing the various properties of the film layer. The application of multi-arc ion plating machines is not limited to the above-mentioned fields, but also involves many industries such as electronics, chemicals, light industry, machinery, national defense, mining, metallurgy, etc., with a high market application rate and a large share, and is deeply favored by consumers.
Its core technology is the arc evaporation source, which is a special self-evaporation and self-ionization solid evaporation source of cold cathode arc discharge, which has the advantages of fast deposition speed, high ionization rate, large ion energy, simple equipment operation, low cost and large production volume.
Product Operate Guide
The startup steps of the vacuum coating machine involve several key operations to ensure that the equipment starts up safely and effectively and enters the working state. The following are the specific steps:
Check the equipment status: First, Make sure that the various components of the vacuum coating machine are in normal condition and without faults. Select the appropriate film material and process parameters as needed.
Power connection: Make the correct power connection according to the machine manual. This includes turning on the main power switch to ensure that the equipment is powered.
Start the vacuum pump and exhaust device: Check whether the vacuum pump and exhaust device are operating normally, which is a key step to achieve the vacuum degree required for work.
Set parameters and preheat: Start the control panel, set relevant parameters and preheat. This step ensures that the equipment operates in the best condition.
Specific operations: Depending on the different vacuum coating machine models and process requirements, other specific operations may also be included, such as turning on the water pump, gas source, starting the maintenance pump, vacuum gauge power, and starting the mechanical pump, pre-exhaust, etc. These steps help to establish and maintain the vacuum environment required for work.
Safety precautions: During operation, personal protective measures should be taken, and work clothes, gloves and protective glasses should be worn to ensure the safety of operators.
Through the above steps, the vacuum coating machine can be safely and effectively started and put into working state. Each step is to achieve or maintain the required vacuum degree, so as to ensure the quality and efficiency of the coating process.
Product Video
FAQ
Q: How long does the training take?
A: About 7-10 days.
Q: How long is the delivery period?
A: 60 working days.
Q: What's your afer-sales service?
A: We provide free installation and training services, as well as technical support.
Q: What payment methods do you accept?
A: We accept T/T,LC.
Product Introduction
The multi-arc ion coating machine is a process test instrument used in the field of materials science, with multiple functions and applications. It is mainly used for coating various hard metal films, metal compound films and decorative films on the surface of metals, ceramics, glass and other materials. The characteristics of this equipment include fast pumping speed, stable vacuum, large loading capacity, and good coating uniformity. The technical indicators and design features of the multi-arc ion coating machine reflect its high performance and wide application in the field of materials science.
Product Advantage
The advantages of multi-arc ion plating machines mainly include high efficiency, no pollution, fast deposition speed, high ionization rate, large ion energy, simple equipment operation, low cost and large production volume.
Wide range of applications: The multi-arc ion coating machine can coat not only metal products, but also non-metal products (such as glass, ceramics, etc.). It can coat metal films, titanium nitride, titanium carbide and other compound films and multi-layer super-hard films. It is widely used in super-hard coatings of tools and molds, as well as automobile wheels, sanitary ware and other fields.
High deposition rate: For some materials such as TiN, the multi-arc ion coater can achieve a deposition rate of up to 100nm/s~1000nm/s
Simplified process flow: The process flow of the multi-arc ion plating machine is simple, and the entire processing process can be completed in a very short time, which improves production efficiency.
Technical Parameters
Model | LY1215 LY1315 LY1615 |
Chamber size | 1200*1500mm, 1300*1500mm, 1600*1500mm |
Sputter able materials | ZrN, TiN, TiN, CrN, TiCN, TiAIN, TiAICN, TiAlCrN etc. |
Coating color | Gold, champagne gold, gun black, dark black, rose gold, blue, green, etc. |
Application fields | sanitaryware, watches, stainless steel furnture, hardware indust res. |
Vacuum structure | Mechanical pump, turbo/Diffusion pump, Roots Pump, holding pump |
U imate vacuum(Pa) | 8.0x10-4Pa |
Heater power | 27KW |
Number of multi-arc targets | 8/10sets, 10/12sets, 14/16sets |
Product Uses
Multi-arc ion plating machines are widely used in the fields of super-hard coatings for tools and molds, decorative coatings for golf clubs, clocks, sanitary ware, lamps, eyeglass frames, hardware products, ceramics and glass, etc.
This equipment adopts the technology of cathode arc evaporation ion plating, based on cold cathode self-sustaining arc discharge plasma evaporation and ionization plating materials, combined with pulse bias technology to improve the energy and activity of deposited particles, thereby enhancing the various properties of the film layer. The application of multi-arc ion plating machines is not limited to the above-mentioned fields, but also involves many industries such as electronics, chemicals, light industry, machinery, national defense, mining, metallurgy, etc., with a high market application rate and a large share, and is deeply favored by consumers.
Its core technology is the arc evaporation source, which is a special self-evaporation and self-ionization solid evaporation source of cold cathode arc discharge, which has the advantages of fast deposition speed, high ionization rate, large ion energy, simple equipment operation, low cost and large production volume.
Product Operate Guide
The startup steps of the vacuum coating machine involve several key operations to ensure that the equipment starts up safely and effectively and enters the working state. The following are the specific steps:
Check the equipment status: First, Make sure that the various components of the vacuum coating machine are in normal condition and without faults. Select the appropriate film material and process parameters as needed.
Power connection: Make the correct power connection according to the machine manual. This includes turning on the main power switch to ensure that the equipment is powered.
Start the vacuum pump and exhaust device: Check whether the vacuum pump and exhaust device are operating normally, which is a key step to achieve the vacuum degree required for work.
Set parameters and preheat: Start the control panel, set relevant parameters and preheat. This step ensures that the equipment operates in the best condition.
Specific operations: Depending on the different vacuum coating machine models and process requirements, other specific operations may also be included, such as turning on the water pump, gas source, starting the maintenance pump, vacuum gauge power, and starting the mechanical pump, pre-exhaust, etc. These steps help to establish and maintain the vacuum environment required for work.
Safety precautions: During operation, personal protective measures should be taken, and work clothes, gloves and protective glasses should be worn to ensure the safety of operators.
Through the above steps, the vacuum coating machine can be safely and effectively started and put into working state. Each step is to achieve or maintain the required vacuum degree, so as to ensure the quality and efficiency of the coating process.
Product Video
FAQ
Q: How long does the training take?
A: About 7-10 days.
Q: How long is the delivery period?
A: 60 working days.
Q: What's your afer-sales service?
A: We provide free installation and training services, as well as technical support.
Q: What payment methods do you accept?
A: We accept T/T,LC.